Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
亚洲体育博彩平台
亚洲体育博彩平台
New-Portuguese-gambling-info@panpanoa.com
Lisboa-Casino-info@zglxjz.com
Sun-City-sales@chatsuriya.com
皇冠体育
皇冠体育
Sports-betting-platform-admin@wickssilverlabs.com
Sun-City-sales@mynewdegree.com
Sun-City-sales@mynewdegree.com
赌博平台大全
Gaming-platform-info@stancomz.com
Gaming-platform-info@stancomz.com
Sands-Gaming-billing@gtrw.net
Sands-Gaming-billing@gtrw.net
西安热线
安吉尔净水器
匹凸匹金融
重庆人事考试网
一起游
凤凰FM
南京链家网
陕西华图
OPPO互联中心官方网站